Use Projects spreadsheet to create many projects at once. Each row in your file becomes one new project, with its name, an optional description, and values for your project custom fields.
Want to import tasks into a project instead? Use Excel / CSV. See Import tasks into Hive.
Have a project brief as a PDF? Buzz can read it and create a project for you. See Create a project from a PDF with Buzz below.
Before you start
You need permission to create projects in the workspace. To fill in project custom fields, you also need permission to edit them.
Use a CSV, XLS, or XLSX file with up to 500 rows of projects. Put column names in the first row.
Create any project custom fields you want to fill before you import. See Custom Fields.
Your plan's project limit still applies. If the import reaches it, Hive stops creating projects.
What you can import
Column | What to put in it |
Project name (required) | The project's name. Rows without a name are not imported. |
Description | Optional notes, up to 10,000 characters. |
Text custom fields | Any text. |
Number custom fields | A number, like 1234.5. |
Date custom fields | A date in the format the importer shows, or YYYY-MM-DD. |
Select custom fields | An option that already exists on the field, spelled the same way. |
Other custom field types can't be filled by this import. Set them on the projects after they are created.
Import your projects
Click your photo or initials in the top right and choose Import tasks and projects.
Choose Projects spreadsheet in the Bring your work into Hive dialog.
Optional: select Download example CSV for a file with the right columns, including your project custom fields. Fill it in and save it.
Upload your file.
In Match columns to project fields, match each column to Project name, Description, or a project custom field. Columns with matching names are matched for you.
Review the rows. Hive marks cells it can't import, such as a missing project name, a number or date it can't read, or a select value with no matching option. Fix them, or leave those rows out.
Start the import. Hive shows its progress, for example Importing projects… 50 of 200.
When it finishes, you see how many projects were created, for example Imported 200 projects.
If some rows were not imported
Hive keeps every project it created, even if other rows fail. When some rows aren't imported, you see a summary, such as Imported 180 of 200 projects or Import stopped, with the reasons.
Select Download rows to re-import. The file has the rows that weren't imported and a Why it was not imported column.
Fix the rows if needed, then import the file again.
Rows you left out because of errors in the review step aren't in this file. Fix those in your original spreadsheet.
Check before you re-import. If the connection failed during an import, Hive can't always confirm whether a row was created. Those rows say they may already have been imported. Look for those projects in Hive first, so you don't create duplicates.
Create a project from a PDF with Buzz
If Buzz is available in your workspace, you can also upload a PDF, such as a project brief or a scope of work. Buzz reads it and creates one project, with the tasks and due dates written in the file.
Click your photo or initials in the top right, choose Import tasks and projects, then choose Projects spreadsheet.
Upload one PDF file. When Buzz is available, the upload screen says Upload an Excel, CSV or PDF file.
In Create a project with Buzz, select Create with Buzz. To stop, select Cancel. The import closes and Hive does not send the file.
A new Buzz conversation opens with your PDF attached. Buzz reads the file and tells you what it found, such as the project name, description, tasks, and due dates.
Answer Buzz's questions about details that are missing or unclear, such as who owns the project or who does each task. Buzz then creates the project and its tasks and shows a summary.
In step 3, you see this message:
Buzz uses only the details in your file. It does not make up tasks or dates.
Buzz asks about missing or unclear details before it creates anything. After you answer, it creates the project. There is no separate preview step. You can edit or delete the project later, like any other project.
One PDF makes one project. To create many projects at once, use a spreadsheet.
Buzz uses your workspace's AI credits for this, like any other Buzz chat. See Your AI Enabled Workspace.
If Buzz isn't available in your workspace, or you use Hive inside Microsoft Teams, the importer accepts only CSV, XLS, and XLSX files.
Good to know
The import only creates new projects. It doesn't update projects that already exist, even if the names match.
You can't undo an import. To remove projects you imported by mistake, delete them like any other project.
To add tasks to one of these projects, open Import tasks and projects from your profile menu, choose Excel / CSV, and select Import to existing project? on the upload screen.